Quality surfacing starts long before the first load of material arrives on site.
Roads, car parks and hard standings perform well when preparation, drainage, base construction and laying methods are planned as one coordinated package. At N&G Groundworks, surfacing programmes are built around long-term performance, safe use and efficient delivery for developers and property teams across Dorset, Somerset and Devon.
If you are planning a new scheme or upgrading existing areas, asphalt surfacing and external finishing should be considered early so levels, edges and service interfaces are right from day one.

Start from the ground up
Ground stability and preparation
A durable finish depends on the condition and consistency of what sits beneath it. Before surfacing begins, formation must be assessed, weak spots treated and levels set accurately to avoid movement under traffic.
If the ground is inconsistent, cracks and settlement can appear long before expected. Early earthworks coordination helps create a stable platform by managing excavation, fill placement and compaction in the right sequence.
This gives the surfacing layer a dependable base and supports predictable performance under repeated loading from cars, delivery vehicles and service access.

Get the sub-base right for the site use
Match the build-up to traffic demand
Sub-base specification should reflect how the surface will actually be used. A lightly used access road and a busy commercial yard do not require the same build-up. Thickness, grading, compaction standard and moisture control all affect how the pavement behaves over time.
When sub-base layers are installed evenly and compacted in controlled passes, load spreads more effectively, and surface fatigue is reduced. This stage also needs an accurate set-out against kerbs, channels and thresholds. Clean geometry here protects the finished appearance and supports long-term durability.
Design drainage into the surfacing plan
Control water before it causes damage
Standing water is one of the most common causes of early deterioration in paved areas. Surface water that cannot drain freely will shorten the life of asphalt and increase maintenance demands.
Falls, gullies, channels and outfalls need to be coordinated before laying starts, with cover levels checked carefully against the final finish. N&G Groundworks integrates foul and surface water drainage with surfacing programmes so runoff is managed correctly across the full site. Good drainage design protects the pavement structure and helps reduce potholes, rutting and edge breakdown.

Choose materials and laying windows carefully
Programme around weather and logistics
Material choice should suit the project, traffic levels and expected weather conditions during installation. Temperature, haul time and laying sequence all affect workability and compaction quality, so timing has a direct impact on finish and lifespan.
Programmes should allow enough continuity for each area to be laid and compacted without unnecessary interruptions. Where phasing is required, joints and tie-ins must be planned so that weak points are minimised. N&G teams coordinate plant, labour and deliveries to keep surfacing operations controlled, efficient and consistent across each section of the site.

Protect edges, interfaces and service details
Focus on high-risk transitions
Many surfacing defects begin at transitions rather than in the middle of the pavement. Kerb lines, ironwork, drainage channels, entrances and utility crossings all require close attention to avoid future failures. If these details are rushed, water ingress and localised movement become more likely.
Early coordination with utility diversions and drainage teams helps prevent late adjustments that compromise levels or compaction quality. Accurate finishing around edges and interfaces also improves visual quality, particularly on schemes where public realm, parking and access roads form a key part of the handover standard.
Build maintenance value into the handover
Set the site up for long-term performance
A good surfacing job should remain serviceable with straightforward maintenance. That starts with a robust build but also includes clear records on pavement construction, drainage routes and service locations.
Property managers benefit from knowing where key assets sit and how water is intended to move across the site. This supports better inspection routines and quicker issue diagnosis if localised defects appear later. N&G Groundworks delivers practical, performance-led surfacing solutions that are built for day-to-day use and long-term asset value.
Speak to our team about your asphalt & tarmac surfacing project
Posted on February 27th 2026
