Balfour Beatty was the main contractor on this project. They appointed N&G Groundworks Ltd to carry out the groundworks and civil engineering.
Click on the photos to enlarge:
£1.00m
Contract
Jan 2013
Completed
Our package included: Section 278 works to the highway, connecting into a local authority’s sewer. Reduce level excavations and disposal of excavated material off site.
Attendance on the pilling along with the construction of the ground beam foundations, sub – structure brick and blockwork, beam and block flooring and external finishes.