This scheme involved the demolition of the former Brecknell Willis factory building, making way for the construction of a new Lidl’s Food Store. The food store was roughly 2,200m² on a 10,000m²  development site.

The main contractor Jessops Construction appointed N&G Groundworks Ltd as their groundworks sub – contractor.

Click on the photos to enlarge:

Brownfield
Site

£0.80m
Contract

N&G Groundworks Ltd package included Section 278 works, connection of new drainage into existing adopted sewers, bulk excavation of materials and earthworks.

Attendance on the Vibro replacement stone columns, construction of the RC ring beams foundations, sub – structure masonry work, RC in – situ retaining walls, tarmac surfacing and external finishes.

Apart of the scheme’s Sustainable urban Drainage an attenuation tank was installed below the 114 – space car park. See the scheme from start to finish on Jessop’s time lapse video here.